Order form WPB
Supplement #1 to order
Specification of the board making equipment
Dear Customers!
Specification of the board making equipment
Dear Customers!
We cannot answer your questions concerning the price of the equipment manufacturing MDF, WPB, OSB, veneer until we know exactly what you want to purchase. Please, fill in the form below. We manufacture production lines of productivity of 5 000, 10 000, 30 000, 50 000, 80 000, 100 000, 150 000 m3/year, the price may vary from 1 000 000 USD to 30 000 000. So without this info we do not know what to send. The info on each assembly includes many pages of text, drawings and photos Iff you can not answer all questions, please, answer to those you can. It will be easier for us to understand what you want
№
|
Order details:
|
Customer’s reply (All lines of the questionnaire must be filled in)
|
01
|
Customer’s country
|
|
02
|
City to where the equipment should be transported
|
|
03
|
Name of the nearest railway station
|
|
04
|
Full name and TIN of the Customer’s company
|
|
05
|
Name of director, contact phone, website, e-mail of the company and director
|
|
06
|
Name of the person, authorized to negotiate, contact phone, e- mail
|
|
07
|
List of goods to be produced by the customer’s company:
|
|
07.1
|
Boards, such as WPB, OSB, MDF, plywood, veneer
|
M3/year
|
07.1.1
|
Board size (Euro/Chinese, lamination (required or not )
|
|
07.2
|
Brick (lime sand brick, ceramic brick, block )
|
pcs./year
|
07.3
|
Coal (carbon): active carbon, press carbon, charcoal
|
tons/day
|
07.4
|
Cellulose and its variants
|
tons/24 hrs
|
07.5
|
Paper
|
tons/24 hrs
|
07.6
|
Sugar: From beet. From raw sugar
|
Raw materials
|
07.7
|
Plant oil
|
tons/24 hrs
|
07.8
|
Used rubber recycling
|
tons/24 hrs
|
07.9
|
Biotechnological products (inuline, feed, yeast )
|
tons/24 hrs
|
07.10
|
Others
|
|
08
|
Capacity of the equipment
|
Day/month/year
|
09
|
Raw materials to be used
|
|
10
|
Electric power limit available
|
kwh
|
11
|
Production area
|
m2
|
|
Length of shops
|
|
|
Width of shops
|
|
|
Height of shops
|
|
|
At present I do not have shops.
|
|
12
|
Boiler room (have, do not have)
|
Tons/hour
|
13
|
Do you have boilers ?
|
|
14
|
Do we need transformer?
|
|
15
|
I wish equipment, corresponding to:
|
|
|
EC standards
|
|
|
Chinese standards
|
|
|
Russian standards
|
|
16
|
I want to pay in:
|
|
|
EURO
|
|
|
US Dollars
|
|
|
Russian Roubles
|
|
|
Chinese RMB
|
|
17
|
I need/ do not need starting up and adjusting
|
|
18
|
I need (do not need) design works
|
|
19
|
Budget
|
|
20
|
What do you want to do from your final product?
|
Chipboard is of furniture, or construction quality.
Cellulose is needed to obtain writing or toilet paper, these are different machines. Not knowing the purpose of the final product, it is difficult to judge which equipment to supply.
|
21
|
Clause 01-06 , must be filled in because without this information, it is impossible to establish the seriousness of your intentions and calculate the transport component of the contract.
Clause 08-15 are desirable for filling, without knowing the productivity, raw materials, without data on the availability of energy, it is impossible to calculate the cost and price.
Clause 15 shows degree of mechanization / automation at your enterprise, the same equipment according to EU standards is 1.5-2 times more expensive as compared with that made by Russian standard and at least 3 times more expensive than the PRC standard.
Clause 16 the settlement system of the parties depends on the currency of the contract.
Clauses 17-18 It is only for the Customer to decide whether he needs them. In Russia, many refuse commissioning. Small companies building small enterprises resolve the issue of building permission with local authorities without submitting a project for approval. All this is decided only by the Customer, and our task is to fulfill his will.
Clause 19 is one of the most important questions, if you don't have a budget, then we have nothing to negotiate about. If there is no budget, but you are going to get it from the bank, then you need a business plan for the project. We can make a business plan for you on a commercial basis and you will have something to go to the bank with.
Items 1,2,3,4,7,8,15,16,17,19,20 must be filled in , without filling these items further cooperation is impossible
|