HOME Leave message CONTACTS

中文

English

Русский


Wood particle board production line 10 000 m3/year
The assembly includes ventilation, all converyors, electric equipment (without power cables)
Personell -20 persons/shift
Motor resource is designed for 15 years (operation – 23 hours/day
Warranty 1 year since crossing the Customer’s country border.
Delivery during 4 months, mounting and  adjustment during 2 months.
Gradual shipment as the equipment is ready
Marking, chosen by customer (individual order)
 
Assembly without wood recycling section and lamination section is also possible.
Payment -50% -advance payment ;, 25% in 60 days, 25%  after full acceptance of the whole production line in the territory of PR China. Payment terms + start and adjustoment conditions are to be agreed upon separately, dependin on conditions and prices in the Customer's country 
 
NO
Equipment
 Brand
Weight,kg
 Quantity
 Power kW
Size, mm 
1.
Preparations of raw materials
 
 
 
 
 
101
Raw material feeding belt conveyor
BZY1150-20
2500
1
8
20000×800×700
102
Breaking machine
BX213
2500
1
32
1750×850×1150
103
Belt conveyor
BZY1150-20
2500
1
8
20000×800×700
104
Shavings bin
BLC11120
2500
1
2
35000×3500×3500
105
Belt conveyor
BZY1150-20
2500
1
8
20000×800×700
106
Planer
BX466
1300
1
18
2500х1700х900
107
Ventilation system for wet raw materials
It is recommended to complete on site
2000
1 set.
13,5
1500х1500х3000
108
Wet shavings bin
BLC11120
2500
1
2
35000×3500×3500
2.
Drying, separation crunching
 
 
 
 
 
201
Spiral conveyor
LSY100
600
1
7,5
450х1450х3600
202
Air jet dryer
UGX-5
2900
1
35
φ750×10000
203
Fire resistant spiral conveyor
LSY100
600
1
7,5
450х1450х3600
204
Vibration sieve
TS-1000*3000
1000
1
1,5
2200х5700х1450
205
Spiral conveyor
LSY100
600
1
7,5
450х1450х3600
206
Spiral conveyor
 
LSY100
600
1
7,5
450х1450х3600
207
Mill
BX566
300
1
10
700х450х1450
208
Dry raw stuff bin
BLC11120
2500
1
2
35000×3500×3500
3.
Feeding and application of raw materials
 
 
 
 
 
301
Dough mill. Internal layer/external layer
BS240B/ BS250B
1000/
700
2
15/10
3500х700х900/
350х400х550
302
Raw stuff feeding system
LUTL9,5
1500
1Set.
10
650х9500х1450
303
Belt conveyor
BZY1150-20
2500
1
8
20000×800×700
4.
Carpet formation and thermal pressing
 
 
 
 
 
401
Machine tool for the carpet laying
BP2113
1500
1
5,5
2000×1800×3500
402
Dust removal system during the carpet formation
It is recommended to complete on site 
2000
1 set
13,5
1500х1500х3000
403
Conveyor for the formed carpet
BZY11150
4000
1
13
2300×1000×15000
404
Magnetic separator
BCX1414
200
1Set.
2
650х1000х1450
405
Compacting machine
BY8313
3500
1
20
2500×2500×3000
406
Ventilation system for the side walls cutting
It is recommended to complete on site
2000
1 set
13,5
1500х1500х3000
407
Accelerating conveyor
LU1600
1000
1
5
2800х5600х1450
408
Returnable system for wastes
LUVH2
200
1Set.
15
1000х1000х450
409
Loader
BZX124×8
10000
1
20
4500х2600х2700
410
Thermal press
BY144×5
35000
1
90
4500×2600×2700
411
Unloader
BZX144×8
10000
1
20
4500х2600х2700
5.
Successivecontrolstage
 
 
 
 
 
501
Star-like cooler
BB1
1000
1
3
2000×700×3000
502
Vertical side wall cutter
BC1114
800
1
9
2000×2000×800
503
Horizontal side walls cutter
BC2114
1000
1
9
3000×2000×800
504
Dust removal system for the side walls cutting
It is recommended to complete on site
2000
1 set
13,5
1500х1500х3000
6.
Polishing
 
 
 
 
 
601
Polishing machine
BSG2314
4000
1
85
2000×2500×2500
602
Dust removal system for polishing
It is recommended to complete on site
2000
1 set
13,5
1500х1500х3000
 
General power – 563,5 kW
 
Note: The above production line is completed by a customer’s order
 
Plate’s size: 6×9 inches (2750×1830mm)
Supplying pipes, ventilation box, hydraulic liquid, drive cable grooming, water and heat lead-in stop valve are not included in that set.

Top